Rehabilitation of ACO LBS Power Plant facilities with the SCADA location system
Test and evaluate 20kV Substation Live Assessment Result.
Modification of merging the chamber “cubicle coupling” into the Cawang Lama 20 kV Power Plant
Move Substation Point.
500 Middle Point Remote Terminal Unit Service and Installation at APD PLN Jakarta Raya and Tangerang
SCADA and Peripheral Services, Repair and Maintenance at Zona Barat APD PLN Jakarta Raya and Tangerang
CCTV Monitoring System, AMR and Local Human Machine Interface, for 54 Power Substation (GI) at PT. PLN APD DKI Jakarta
Installing SCADA Zero Down Time MEGA KUNINGAN and SCBD Regions at PT. PLN APD DKI Jakarta
Design, Installation and Commissioning of Main Low Voltage Distribution Panels for Electricity Reliability of the PUSTEKOM Ministry Power Grha Tama Building Education and Culture
Design of Modernization of Electrical Equipment, Mechanics and Construction of Buildings of the Cooperative Complex, MSP Building and MRP of the Central Bank of Indonesia
150 kV Substation Construction in NTB, Pontianak and Aceh.
Civil Construction for Belilas Gas Booster Station Geo technical improvement-TGI.
Construction of Office Buildings and Renovations in the Office of PDAM Tirta Benteng, Tangerang.
Development Laboratory Building of PDAM Tirta Benteng, Tangerang.
Release, Install, Recondition and leak Block Uji Valves, Pasuruan – East Java.
Renovation of Baraya Office (Civil and Electric Construction).
Civil construction of 20 kV Substation, Scada installation for PT PLN (Persero). Central and South Kalimantan.