Success Story

Success Story

  • Rehabilitation of ACO LBS Power Plant facilities with the SCADA location system
  • Test and evaluate 20kV Substation Live Assessment Result.
  • Modification of merging the chamber “cubicle coupling” into the Cawang Lama 20 kV Power Plant
  • Move Substation Point.
  • 500 Middle Point Remote Terminal Unit Service and Installation at APD PLN Jakarta Raya and Tangerang
  • SCADA and Peripheral Services, Repair and Maintenance at Zona Barat APD PLN Jakarta Raya and Tangerang
  • CCTV Monitoring System, AMR and Local Human Machine Interface, for 54 Power Substation (GI) at PT. PLN APD DKI Jakarta
  • Installing SCADA Zero Down Time MEGA KUNINGAN and SCBD Regions at PT. PLN APD DKI Jakarta
  • Design, Installation and Commissioning of Main Low Voltage Distribution Panels for Electricity Reliability of the PUSTEKOM Ministry Power Grha Tama Building Education and Culture
  • Design of Modernization of Electrical Equipment, Mechanics and Construction of Buildings of the Cooperative Complex, MSP Building and MRP of the Central Bank of Indonesia
  • 150 kV Substation Construction in NTB, Pontianak and Aceh.
  • Civil Construction for Belilas Gas Booster Station Geo technical improvement-TGI.
  • Construction of Office Buildings and Renovations in the Office of PDAM Tirta Benteng, Tangerang.
  • Development Laboratory Building of PDAM Tirta Benteng, Tangerang.
  • Release, Install, Recondition and leak Block Uji Valves, Pasuruan – East Java.
  • Renovation of Baraya Office (Civil and Electric Construction).
  • Civil construction of 20 kV Substation, Scada installation for PT PLN (Persero). Central and South Kalimantan.